Gok HEPP Construction Project
General Information
Location Turkey - Bilecik Osmaneli
Project Start 5.05.2017
Project Comp01.10.2019
Client GULSAN Electric Production Co.
Project Description

This Design-Build DAGBASI hydroelectrical power stations project consists of , power station buildings,1500 M ENERGY TUNNEL , water transmission line including an open canal and a penstock.

DAGBASI HEPP has three horizontal Francis type turbines (2 x 4 = 8 MW 1 x 2 = 2 MW).