Tımarlı HEPP Construction Project
General Information
Location Turkey - Çankırı Kızılırmak
Project Start 03.02.2018
Project Comp 01.06.2019
Client Konka Construction
HIDAS Electric Production Co.
Project Description

This Design-Build TIMARLI hydroelectrical power stations project consists of , power station buildings, water transmission line including an open canal and a penstock.

TIMARLI HEPP has three vertical kaplan type turbines (3 x 2,5 = 7,5 MW).